Make sure the substrate is effectively sealed and that each one hungry locations are dealt with before proceeding to put in the system. In the event the overcoating time frame with the primer is exceeded, the area need to be evenly abraded and vacuumed in advance of further more coats https://mcgepoxycoatings.com/why-decorative-quartz-screed-works-wonders-for-hospitality-flooring/