it's computed as the overall time from once the failure happened to when operation was absolutely restored. Rig stand-by time is routinely considered as optimistic NPT (fig. six).
the data on this website page is being https://deannampmb609605.aboutyoublog.com/29569490/the-best-side-of-drill-time-investments